Masterarbeit, 2020
100 Seiten
CHAPTER ONE
GENERAL INTRODUCTION
1.1 Background of the Study
1.2 Problem Statement
1.3 Objectives of the Study
1.3.1 General Objective
1.3.2 Specific Objectives
1.4 Research question
1.5 Research Hypotheses
1.6 Conceptual Framework
1.7 Significance of the Study
1.8 Scope of the study.
1.8.1 Conceptual scope
1.8.2 Geographical scope
1.8.3 Time scope
1.9 Organization of the study
CHAPTER TWO
LITERATURE REVIEW
2.1 Introduction
2.2 Definition of Key Concept
2.2.1 Evaluation
2.2.2 Project
2.3 Theoretical Review
2.3.1 Monitoring
2.3.2 Evaluation
2.3.3 Project Time Management
2.3.4 Project time efficiency
2.3.5 The steps for time Management process
2.3.6 Project cost Minimization
2.3.7 Project scheduling (Activity Network)
2.3.8 Project Budget Adequacy
2.3.9 Project Cost Minimizing
2.3.10 Cost Estimating tools and Techniques
2.3.10 Developing a Baseline Cost for a project
2.3.11 Project Quality Management
2.3.12 Project performance indicators
2.3.13 Ten steps towards building a performance based M&E system
2.3.14 Development Project Cycle
2.3.15 The need for Monitoring and Evaluation in Project Management
2.3.16 Approaches of Monitoring and Evaluation.
2.3.17 Traditional Approach
2.3.18 Participatory Approach
2.3.19 Designing Monitoring and Evaluation
2.4 Empirical Review
2.5 Research Gap
CHAPTER THREE
RESEARCH METHODOLOGY
3.0 Introduction
3.1 Case Study Profile
3.2 The Research Design
3.3 Population of the Study
3.4 Sample Size
3.5 Data Collection Techniques
3.6 Data Collection Methods and instruments
3.6.1 Primary data
3.6.2 Questionnaire Method
3.6.3 Secondary data
3.6.4 Documentation
3.7 Data validity and reliability of the data collection Instruments
3.7.1 Validity of Instruments
3.7.2 Reliability of Instruments
3.8 Data processing
3.9 Editing
3.10 Coding
3.11 Tabulation
3.12 Data Analysis
3.12.1 Quantitative Data Analysis
3.12.2 Qualitative Data Analysis
3.13.3 Descriptive Method
3.14.4 Correlation
3.13 Ethical Considerations
3.14 Limitations of the Study
CHAPTER FOUR
DATA PRESENTATION, ANALYSIS AND DISCUSSION OF RESULTS
4.1 Data analysis and interpretation
4.1.1 Respondents’ general information
4.1.2 Analysis of the findings
4.1.3 Gender Respondents
4.1.4 Age Respondents
4.1.5 Respondent’s marital status
4.1.6 Education Level of the Respondents
4.1.7 Working experience
CHAPTER FIVE
SUMMARY OF MAJOR FINDINGS, CONCLUSION AND RECOMMENDATION
5.0 Introduction
5.1 Summary of major findings
5.1.1 Compliance to Quality Standards
5.1.2 Compliance to activity Cost Performance
5.1.3 Compliance to activity duration performance
5.1.4 The correlation between Monitoring and evaluation on project performance in World Vision Rwanda
5.1.5 Regression Analysis
5.2 Conclusion
5.3 Recommendations
5.4 Scope for Future studies
The primary aim of this research is to assess the impact of monitoring and evaluation on project performance at World Vision Rwanda, identifying how specific practices such as quality compliance, activity cost management, and activity duration management influence project outcomes.
2.3.1 Monitoring
Project management has the task of establishing sufficient control over a project to ensure that it stays on track to achieve its objectives.
As defined by USAID (2012), Monitoring is an ongoing process that indicates whether desired results are occurring or not. It aims to measure progress toward planned results, usually through preselected indicators. Monitoring reports on actual performance against what was planned by collecting, analyzing and reporting data of all projects, programs and policies to support effective management
Magnen (1991:118) defined Monitoring as a system of continuous information for the use of a project manager. In view of monitoring, implementation is seen as a continuous learning process where experience gathered is analyzed and feed back into planning and updated implementation approaches. Monitoring can be defined as a continuing function that aims primarily to provide the management and main stakeholders of an ongoing intervention with early indications of progress, or lack thereof, in the achievement of results (UNDP, 2009, 16).
CHAPTER ONE: This chapter introduces the study, covering the background of the problem, research objectives, hypotheses, and the conceptual framework for evaluating monitoring and evaluation at World Vision Rwanda.
CHAPTER TWO: This chapter provides an extensive literature review on the definitions and theoretical foundations of monitoring, evaluation, project time management, cost minimization, and project quality management.
CHAPTER THREE: This chapter details the research methodology, explaining the case study design, population size, sampling techniques, and data collection tools used to analyze project performance.
CHAPTER FOUR: This chapter presents the data collected, covering respondent profiles, statistical analysis of findings, correlation results, and regression models assessing the variables of project performance.
CHAPTER FIVE: This chapter summarizes the major findings, presents the final conclusions, and provides recommendations for World Vision Rwanda to enhance its monitoring and evaluation practices.
Monitoring, Evaluation, Project Performance, Rwanda, World Vision, Quality Standards, Activity Cost, Activity Duration, Project Management, Regression Analysis, Correlation, Capacity Building, Livelihood Projects, Accountability, Development Assistance.
The research focuses on assessing the effectiveness of monitoring and evaluation systems and their impact on the project performance of World Vision Rwanda.
The study investigates the compliance to quality standards, activity cost management, activity duration performance, and the overall relationship between monitoring/evaluation and project outcomes.
The main objective is to determine whether implementing rigorous monitoring and evaluation practices leads to improved project performance and to identify the strength of this relationship.
The study utilizes a descriptive research design, combining quantitative data from staff questionnaires (using Likert scales) and qualitative data from interviews and document reviews.
The work covers theoretical reviews of project management, detailed methodologies for data collection and processing, and an analysis of results regarding budget execution, quality achievement, and time utilization.
Key terms include Monitoring, Evaluation, Project Performance, World Vision, Quality Standards, Activity Cost, Activity Duration, and Project Management.
The 3D log frame serves as a conceptual model to visualize the relationship between a project planner's goals and a project manager's implementation, highlighting variance analysis as a basis for effective monitoring.
The research addresses the lack of detailed analysis on the specific combination of time utilization, budget adequacy, and stakeholder participation within the context of World Vision Rwanda projects.
Standard deviations are used to measure the homogeneity or heterogeneity of respondent views, helping to validate the reliability of the collected survey data.
The study concludes that monitoring and evaluation have a high and significant positive impact on project performance, with quality standards appearing as the best predictor for success.
Der GRIN Verlag hat sich seit 1998 auf die Veröffentlichung akademischer eBooks und Bücher spezialisiert. Der GRIN Verlag steht damit als erstes Unternehmen für User Generated Quality Content. Die Verlagsseiten GRIN.com, Hausarbeiten.de und Diplomarbeiten24 bieten für Hochschullehrer, Absolventen und Studenten die ideale Plattform, wissenschaftliche Texte wie Hausarbeiten, Referate, Bachelorarbeiten, Masterarbeiten, Diplomarbeiten, Dissertationen und wissenschaftliche Aufsätze einem breiten Publikum zu präsentieren.
Kostenfreie Veröffentlichung: Hausarbeit, Bachelorarbeit, Diplomarbeit, Dissertation, Masterarbeit, Interpretation oder Referat jetzt veröffentlichen!