Masterarbeit, 2019
73 Seiten, Note: 2,3
This case study investigated a BIM-enabled FM concept within a construction project, which took place during the phase of the tendering preparation. The study asked for the requirements and preconditions in the concept, why they have been defined and examined their effects on the tendering preparation.
Next to eight use cases, several necessities regarding the future O&M software, like a BCF support or the compatibly with certain software formats, it was found that the dealing with the integration of BIM in FM, disclosed inefficient customer processes and documents. As a highlight an efficient, risk minimizing documentation process, is described.
The web-based process uses a plant classification code, to automatically link uploaded handover documents with corresponding model elements and offers the possibility to continuously perform the handover. The process is seen as a good possibility to increase the handover quality and to reduce the associated risk resulting out of inadequate and lacking documentations.
Der GRIN Verlag hat sich seit 1998 auf die Veröffentlichung akademischer eBooks und Bücher spezialisiert. Der GRIN Verlag steht damit als erstes Unternehmen für User Generated Quality Content. Die Verlagsseiten GRIN.com, Hausarbeiten.de und Diplomarbeiten24 bieten für Hochschullehrer, Absolventen und Studenten die ideale Plattform, wissenschaftliche Texte wie Hausarbeiten, Referate, Bachelorarbeiten, Masterarbeiten, Diplomarbeiten, Dissertationen und wissenschaftliche Aufsätze einem breiten Publikum zu präsentieren.
Kostenfreie Veröffentlichung: Hausarbeit, Bachelorarbeit, Diplomarbeit, Dissertation, Masterarbeit, Interpretation oder Referat jetzt veröffentlichen!
Kommentare